Equipment Required
Item | Justification | Comment |
---|---|---|
Bill of Materials (BOM) | UUT | - |
Engineering Requirements / Budget | Point of reference needed to test against | - |
Test Results
Result | N/A |
---|---|
Date | |
Signature | |
Comments |
Testing Procedure
- Add up costs of individual components making up the drone using the bill of materials.
- Compare calculated value from BOM with the budget or the engineering requirements spreadsheet.
Change Log
Date | Change |
---|---|
Info
Team Name | P20123 |
---|---|
Date | 22 Apr 2020 |
Author | Atulya John |