Page tree
Skip to end of metadata
Go to start of metadata


Equipment Required

ItemJustificationComment
Bill of Materials (BOM)UUT-
Engineering Requirements / BudgetPoint of reference needed to test against-

Test Results

ResultN/A
Date
Signature
Comments


Testing Procedure

  1. Add up costs of individual components making up the drone using the bill of materials.
  2. Compare calculated value from BOM with the budget or the engineering requirements spreadsheet.


Change Log

DateChange




Info

Team NameP20123
Date22 Apr 2020
AuthorAtulya John
  • No labels