Team Vision for Build & Test Prep Phase
Summarize:
- Plan:
- Review and update test plans
- Review and update risk management
- Finalize BOM
- Accomplishments:
- Updated test plans
- Update risk management
- Updated BOM with more complete information
Test Plan Summary
Requirements and Testing Document: https://docs.google.com/spreadsheets/d/1_IZcNNnW0dwpgoJAZ-F0mmnLqIqh75EQA9Q7DGl4pTg/edit#gid=2094414087
Test Plans
| Test | Owner | Description | File | Helpful Documents |
|---|---|---|---|---|
| P1 | Allison | AC/DC Converter Output Test | ||
| P2 | Allison | Motor DC/DC Converter Output Test | ||
| P3 | Allison | Servo DC/DC Converter Output Test | ||
| P4 | Allison | Power System Integration Test | ||
| M1 | Josh | Motor step distances | ||
| M2 | Josh | Motor supports proper weight | ||
| U1 | Andrew | Supports 1 Monitor | ||
| U2 | Andrew | Maximum distance of bluetooth connection | ||
| U3 | Andrew | Input Delay | ||
| U4 | Andrew | Responds direct input | ||
| U5 | Andrew | Tactile inputs | ||
| U6 | Andrew | Student input power duration | ||
| U7 | Andrew | can fit on wheelchair table |
Risk and Problem Tracking
Risk Tracking
Problem Tracking
No problems have arisen yet.
Design Review Materials
Build and Test Prep Design Review Notes
- Pre-reads
- Notes from review
- Action Items
Plans for next phase
Team Plan
- As a team, where do you want to be in at your next review?
- All subsystem components are ordered
- Start subsystem tests
- User Interface Subsystem
- Buttons can be read
- Have UI designed
- Joystick can be read
- Control Subsystem
- Move motors specific amount
- Move Servos
- Motor Subsystem
- Have motors moving
- Mechanical Subsystem
- Have all parts
- Parts assembled
- Power Subsystem
- power tests
- obtain all parts
- Belt Subsystem
- have all parts
- test motors with belts to determine step distance
- test motors with belts to determine if second belt is needed
- Gripper Subsystem
- Pick objects up
- cup printed
- have gripper printed