Date

Link to pre-read here.

Attendees

  • Zachary O'Brien

  • Jonathan Kabamba
  • Joshua Nagy
  • Marissa Shaw
  • Adam Palumbieri
  • Thomas Endress

Goals

  • During this phase, the team created a BOM, and put together designs for the transmitter and receiver hardware, enclosures, and software. Test data from some laundry machines was obtained, and a list of possible machines with their respective specs was started.

Agenda and discussion notes

TimeItemWhoNotes

2 mins

Agenda, Team Vision

Marissa Shaw


5 mins

Current Prototype - Simulation

Joshua Nagy


2 mins

Current Prototype - Enclosure

Jonathan Kabamba


5 mins

Prelim Schematic - Transmitter

Zachary O’Brien


5 mins

Prelim Schematic - Receiver

Jonathan Kabamba


2 mins

Software Flowchart

Thomas Endress


2 mins

Bill of Materials

Marissa Shaw


2 mins

Feasibility

Marissa Shaw


2 mins

Risk Assessment

Adam Palumbieri


2 mins

Gantt Chart: Phase Three

Adam Palumbieri


5 mins

Questions & Answers

All Members


Issues Raised

  • List here
  • If appropriate, assign action items below to resolve issues.

Decisions Made

  • List here
  • Listing all decisions where team, guide, and client can see them helps keep everyone on the same page.

Action items

  • Complete a peer evaluation after your review. Recommended template is here
  • post meeting notes document to each phase
  •  
  • @mention a person to add them as an attendee to assign action items, with due dates
  • add your own action items here

0 commentaires

Vous n'êtes pas connecté. Toutes vos modifications seront marquées comme réalisées par anonyme. Vous pouvez vous connecter si vous disposez déjà d'un compte.