Details

Date: Monday, November 02, 2020

Time: 10:00-11:15 AM

Location: https://rit.zoom.us/j/99051711329

Agenda: https://docs.google.com/document/d/1f4e4ArrjVB0VzxWKCl7PzDlWlBZcjx174-x8i8go-tc/edit?usp=sharing

Slide deck: https://docs.google.com/presentation/d/1ynjWxyF3E__UAZ79HJFozY0SFZQN6SHb1O73QpL2czE/edit?usp=sharing

Project overview document: https://docs.google.com/document/d/1VLp_J5oBDFqTUjXiyGni8UUL6vyUU9oyLmJ4bCD_UBw/edit?usp=sharing

Attendees

Goals

  • Share the progress that has been made and the insight that has been acquired as a result of the feasibility testing items that have been acted on since the previous review.
  • Reiterate prioritized feasibility items and assignments.
  • Discuss the prioritization of first assessing UV crosslinking feasibility.
    • Safety specifications
    • Implementation
  • Discuss the prioritization of first assessing syringe pump design and implementation.
    • Assembly
    • Modification of design for specific application
    • Mounting
    • Software-based control

Agenda and discussion notes

Time

Item

Who

Notes

3 minRefresher

Diana Kulawiec


2 minTeam vision

Ramsey Doolittle


1 minFeasibility overview

Hayley Miller


3 minUV crosslinking overviewHayley Miller
7 minUV crosslinking safetyHayley Miller

2 min

LED implementationFélix Chamberland
4 minUV testing conditionsEmma Kurz
3 minUV crosslinking evaluation parametersDiana Kulawiec
4 minSyringe pump overviewRamsey Doolittle
7 minSyringe pump CAD design detailsRamsey Doolittle
4 minUV attachment relative to syringe pumpFélix Chamberland
4 minSyringe pump software overviewMark Truskinovsky
4 minSyringe pump next stepsMark Truskinovsky
3 minFeasibility task 4 - printing parametersMark Truskinovsky
3 minFeasibility task 5 - printhead weightEmma Kurz
2 minFeasibility task 6 - Syringe size/nozzleDiana Kulawiec
3 minUpdates on system-level flow chartFélix Chamberland
4 minBill of materials (BOM)

Mark Truskinovsky


2 minRisk assessmentMark Truskinovsky
2 minPlans for next phaseEmma Kurz
  •