Date

Monday September 9th, 2020 at 4:40pm

The PowerPoint presentation can be found here.

Zoom link: https://rit.zoom.us/j/93178553353

Attendees

Goals

During this review our team would like to get feedback on our progress. We would like to verify that our customer and engineering requirements are all satisfied by the client. 


Agenda and discussion notes

TimeItemWhoNotes
1 min Team Introduction and rolesAllbriefly introduce yourself to the client
5 min Problem and DeliverablesVeronicaIncludes current state
3 min StakeholdersTravisyard
5 min Use Case ScenarioKaraDo you change difficulty between students or classes?
5 min Customer RequirementsClayton
5 min Engineering RequirementsClayton
5 min Preliminary ScheduleTravisyard
5 min Risks and Corrective ActionsVeronica

Issues Raised

  • Include FOS with weight constraint
  • Redundancy is important for safety (i.e. back-up cable in case of structural failure)
  • Nearly 15 students are in the 6 ft tall range
  • Things can be attached to structures for shorter kids (i.e. hanging rings from existing rings, adding a mat below to decrease distance from ground, etc)
  • Be sure to talk to coaches when observing a Ninja Warrior class
  • Repeatability: We need to document everything so he can potentially redo our obstacle
  • We should do hands-on work first in case of COVID sending us home

Decisions Made

  • List here
  • Listing all decisions where team, guide, and client can see them helps keep everyone on the same page.

Action items

  • Complete a peer evaluation after your review. Recommended template is here
  • post meeting notes document to each phase 
  • @mention a person to add them as an attendee to assign action items, with due dates
  • add your own action items here