Agenda
- body tubes; ID, getting the tubes off the mandrel, cutting the tubes
- Keeping up with the schedule
- documentation, putting things on the wiki
- General Updates
Discussion
Updates:
- Body tube wrapped, need to remove, finish is very poor
- Need to acquire dry ice or alternative method to remove
- Nose cone
- CAM is complete, will attempt to mill soon
- Will buy MDF
- Avionics hardware
- Need to complete solder of the board
- PCB is here and complete
- Need
- Software
- Need to complete new altimeter library
- I2C not working
- Expected completion
- Avionics Bay Mfg
- Need to evaluate what we have and what we need to order
- 2 weeks
- Carbon F
- Fin Can
- Printed test of fin can and fins
- Change filament from PETG to Titan X
- Will hold off on another print
Documentation:
- Everyone needs to update
Manufacturing
- Need method to cut
- X-winder Jig
- Fixed on frame
- Rotate Dremel
- Change to Slow Cure
SPEX Collaboration:
- Concern with RF Transparency
- SPEX radio needs comms.
- Options
- External antenna
- Communications through our avionics
- Would need to extend UART cables
- SPEX needs GPS comms
- Potential hot swap from external antennae to payload
- Potentially
- Need to continue communications with Dan
- Stainless Steel
- Not permitted in IREC Design test and Evaluation guide
- Page 26
- Stainless not allowed for "structural capacities"
Action Items
Patrick Ekeren Remove mandrel
Matt Ryan Acquire and mill molds 11/7/2020
Joseph Even Solder SPICA
Will Merges Implement all the libraries for the software
Joy Sangsrichan Implement communications for all the sensors
Aubrey Figoras Inventory Parts Required for Bay
Aubrey Figoras Order parts for bay
Patrick Ekeren Communicate ID of the tube
Brahm Soltes Follow with Joe
Joseph Even Follow up with the Dan
Matt Ryan to design jig 11/31/2020
Brahm Soltes Fully assemble all CAD components, verify the geometries in the CAD, adjust to real values