Date

Attendees

Discussion items

ItemNotes
Payload Updates
  • Previous Action Items:
    • Ben Hyman  / - verify DARWIN redesign w/ Joe
      • Joe "mostly" approved - still seeking final verification
    • Will Merges  / - order DARWIN v1.1 when Ben is ready
      • Need design verified by Joe first (see above action item)
    • Will Merges / - email NYSG, reimbursement never came
      • done, sent invoice, check should be in the mail soon (sent to Vanessa Mitchell)
    • Yevgeniy Gorbachev / - mechanical redesign (eyebolt, internal frame, sheer pins)
      • done
    • Yevgeniy Gorbachev Will Merges / - order parachute bay parts from SendCutSend
      • ordered and parts arrived
Ground Station Updates
  • figured out low power shutdown on battery
    • connect to DC-DC converter AFTER connecting input to battery
      • use double pole switch for real setup, doubles as hot swap switch
  • Mary Dertinger & Aaron Chan & Yevgeniy Gorbachev redesigning bottom plate
  • Aaron Chan working on altimeter servo
    • not working with Teensy 4
      • think it's because it needs 5v logic (teensy is 3.3v)
Worksession

Action items