RIT will permanently shut down the RIT Wiki (Confluence wiki) on February 2, 2024. Review the Wiki Shut Down Overview for information on alternative tools, exporting content from the wiki, and other FAQs.
Equipment Required
Item | Justification | Comment |
---|---|---|
Bill of Materials (BOM) | UUT | - |
Engineering Requirements / Budget | Point of reference needed to test against | - |
Test Results
Result | N/A |
---|---|
Date | |
Signature | |
Comments |
Testing Procedure
- Add up costs of individual components making up the drone using the bill of materials.
- Compare calculated value from BOM with the budget or the engineering requirements spreadsheet.
Change Log
Date | Change |
---|---|
Info
Team Name | P20123 |
---|---|
Date | 22 Apr 2020 |
Author | Atulya John |