Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your Confluence file repository should still contain original editable files).

All template text must be removed prior to your Integrated System-Level Build & Test Review

Team Vision for Integrated System Build & Test Phase

Summarize:

  • What did your team plan to do during this phase?
    In this phase we planned to Integrate the RealSense for full functionality, the particle filter, and ensure accurate functionality of safe zone. This would allow us to have a complete demo for which our golf cart is capable of functioning autonomously. 
  • What did your team actually accomplish during this phase?
    During this phase we developed a mitigation plan for how to best move forward with our APM project with the drastic changes introduced by the recent COVID-19 outbreak. We have setup a plan on how to document our current work so another team could come in and finish it. By documenting detailed information on how to get started and outlining the future plans, we hope to minimize the time it takes to figure things out and get past the learning curve of ROS, Linux, and the APM vehicle itself. We took time to figure out where we left off and can give future plans and ideas for the phases that follow. 

Test Results Summary

Below are our updated requirements and testing documents. These explain where we left off in our testing and what requirements have been completed. Also explains what may have gone wrong in testing and how to fix the issues. 

Requirements.xlsx

Testing.xlsx

Risk and Problem Tracking

Functional Demo Materials

Plans for next phase

  • As a team, where do you want to be in three weeks at your next demo with your customer (if you haven't already done this)?
    • Have a fully documented code for the next team to be able to pick up where we left off. Also create a video on how to operate the golf cart with previous videos that we have and some screen recordings of our current code with explanations. Create future work that could be done to improve the golf cart.

  • As an individual on the team, what are you doing to help your team achieve these goals? (Use the individual 3-week plan template attached to this page for this)

Chris's 3-week plan