| Subteam | Break Action Item Progress | Plan for rest of break | Other Action Items |
|---|
| Structures |
| - Update CAD to reflect openrocket
- get grace filament
- look into layup process for nosecone
|
|
| Analysis | - RASAERO model - talk to Alex
- Tensile testing doc finished
| - FEA boat tail being worked
- set up meeting with Alex next week
- Bulkhead FEA - need wire size Aaron Chan
- Start writing tech paper blurbs
| - Grace Dertinger send to Carter - tensile doc
- need to fill out form for ANSYS through ITS
|
| Reaction Wheel | - Made shielding between magnetic sensor and encoder
- redesigned base and shell
| - Figure out test bed rocket
- put control code into desktop demo
| - keep things simple in the test bed rocket model - keep things moving forward
|
| Avionics | - started wiring
- looking into viable connectors
- Looking at IREC REQ and DTEG - min dia is 22 gauge
- stick to acidoplastic (delrin / HDPE) - looking for more cost-effective
| - need length of wiring to TD-2
- CAD for Av bay done
- look into 1/4 inch delrin from basement
| |
| Payload | - General frame finished - selecting COTS parts
- 2 bar load cells being used
| - Finish CAD details
- Finish Av bay CAD - need component selection
- SCRAP schematic
- meeting with Yev to talk layout
- Figuring out chute size and where to reef - using zip tie and line cutter to open
| |
| Backplane | - Finished WIZNET schematics
- Radio board and power board schematics almost done
- LED blinking
- Take Home List:
| - Who will be main backplane lead at RIT
- testing SPI flash and BMP390
- reviewed code for ADXL
| - add breakouts to BOM
- make new schedule - firm - assign tasks
|
| Recovery |
|
| reach out to James for updates |
| Other | - Finished final report and invoice for NYSG
- Continue work on sponsorships
| | - Alex Speyer work with Mike on getting a desktop with full ANSYS and fusion in the makerspace
|