| Item | Notes |
|---|
| New Meeting Time | - New meeting times will be Thursday at 7pm
|
| Payload Updates | - FDR
- Completed 1/15/22
- suggestions from FDR:
- internal frame material for heat of VTX, PETG → ABS (or something with higher melting point)
- look at heat output of VTX (probably experimentally)
- shock cord between eye bolt and shroud lines, risk of cutting shroud lines on edge of bay
- e-tape shroud lines (x2 FOS)
- acrylic walls may get damaged in NM heat/sun
- DARWIN Redesign Progress
- Ben Hyman "pretty much done with it"
- verify w/ Joe
- Billy Siegener total changes: add power resistor to 3.3v regulator, 5v rail non-flight critical
- Ben Hyman - DARWIN Revisions IREC-2022
- See first two action items
Sand angle grind DARWIN- actually redesign internal mounts with extra clearance for DARWINYevgeniy Gorbach
- DARWIN to LEO - sponsored by RunCam
- Use CEMA to assemble DARWIN
|
| IREC Updates | |
| Ground Station | - "battery broke" - Adam Lehman
- when output to DC-DC converter drops voltage to ~2v
- "Low shutdown current for 20V port:200mA "
|
| NIGEL | - briefly include NIGEL in FDR
|